Intermittent Bonded Ribbon Production Line For Sale
With a listed operating speed of 600 m/min, this machinery offers substantial capacity for optical-fiber production. Prospective buyers should confirm the achievable speed, machine setup, and required operating conditions directly with the manufacturer before proceeding.
Shanghai Weiye OFC provides a system engineered to manufacture 12- and 16-fiber rollable ribbons. The published product information covers capabilities, technical details, and supplied systems, helping U.S. buyers begin evaluating the equipment against their manufacturing needs.
Begin by examining the stated equipment configuration, then ask the supplier for pricing, installation requirements, and project-specific alternatives. This approach helps determine which equipment details apply to your particular manufacturing site and goals.
The listed address for Shanghai Weiye Optic Fiber Communication Equipment Co., Ltd. is 201 Minyi Road, Songjiang District, Shanghai. Use the product page for initial reference and verify current technical and commercial information directly with the company. A detailed quotation request can help advance your equipment evaluation.
Intermittent Bonded Ribbon Fiber Draw Tower Compact Fiber Unit
Key Takeaways
- A speed of 600 m/min is listed, but buyers should verify the operating conditions with the manufacturer.
- This equipment supports production of 12-fiber and 16-fiber rollable ribbon formats.
- Information about equipment functions, specifications, and included systems appears on the product page.
- Request details about pricing, installation requirements, and project-specific customization.
- The supplier provides a business address in Songjiang District, Shanghai.
Intermittent Bonded Ribbon Production Line Overview
The manufacturer identifies this machinery as suitable for 12- and 16-fiber rollable IBR formats. The published specifications state a 600 m/min construction speed together with a fiber diameter of Ф245 μm ±10 μm. Because these figures represent stated machine specifications, buyers should verify achievable speeds and operating conditions with the manufacturer.
Intermittent Bonded Ribbon Production Line
Designed To Produce Twelve- And Sixteen-Fiber Rollable Ribbons
Two fiber-count options are supported by the configuration for manufacturing rollable ribbons. Buyers can use these options as a starting point for checking compatibility with target formats, fiber sizes, and handling requirements.
How Intermittent Adhesive Bonding Allows Flexible Fiber Configurations
According to examples in the patent, fibers are arranged in adjacent subunits with adhesive connections applied periodically. The patent provides an example of adhesive-bond intervals ranging between 10 mm and 1,000 mm. Unlike continuous bonding, this arrangement does not join the fibers along their entire length.
These intermittent adhesive connections allow the assembly to change from a relatively flat configuration into rolled, curled, or folded forms. These bond-spacing figures describe examples of the design approach and should not be interpreted as stated equipment settings.
- Machine details: 12 or 16 fibers, a stated speed of 600 m/min, and a diameter of Ф245 μm ±10 μm.
- Patent example: Adhesive-bond intervals ranging from 10 mm to 1,000 mm.
- Design benefit: Flexible handling across several possible shapes.
Applications In Optical Fiber Cable Manufacturing
Flexible ribbon arrangements can help cable designers balance access for splicing with compact cable packaging. The patent outlines a configuration that maintains fiber organization while allowing portions to move between adhesive connection points during cable assembly.
Compact Cable Designs And High Fiber Density
For mass fusion splicing, an optical fiber ribbon can be arranged flat before being folded or rolled into a more compact cable. Potential advantages described in the patent include smaller cable constructions and an increased ratio of fiber area to overall cable cross-sectional area. Actual performance and dimensions will vary according to the overall cable design and the application for which it is intended.
Organizing Fiber Ribbons To Support Efficient Fusion Splicing
The ribbon format enables organized handling at the splice location while allowing the subunits to move during cable assembly. The manufacturer’s material-handling specifications identify payoff reel capacities of 25.2 km and 50.4 km of fiber. Buyers can evaluate these capacities against their production requirements and existing handling arrangements.
| Design characteristic | Possible application | Buyer consideration |
|---|---|---|
| Flat fiber configuration | Mass fusion splicing | Verify the needs of your splicing process |
| Folded or rolled format | Space-efficient cable packaging | Review the overall cable construction |
| 25.2 km and 50.4 km capacity payoff reels | Planning material-handling operations | Match the reel capacity to production operations |
Specifications And Performance Of The Production Line
Before asking for pricing, assess whether the stated machine performance matches the demands of your production process. Installation preparations should also account for suitable reels and the utilities available at the production site.
Production Speed, Fiber Diameter, And Attenuation
According to the specifications, the construction speed reaches 600 m/min. The specified fiber diameter is Ф245 μm ±10 μm, while additional attenuation is stated as ≤0.01 dB/km at 1550 nm. Ask the supplier to verify the testing conditions and achievable results.
Payoff And Take-Up Reel Compatibility
The payoff system accommodates two reel dimensions, and the maximum weight of a full reel is 10 kg. The take-up assembly supports a T-type reel as well as a fiber-optic reel. Verify that your selected reel configuration is compatible with the facility’s material-handling process.
Facility Utilities And Operating Environment
The machine requires a three-phase, five-wire electrical supply rated at 380 V ±10%. Its specified operating environment is enclosed, clean, dry, and protected from drafts, with temperatures of 15 to 25°C and relative humidity no higher than 85%. Utility requirements also include nitrogen at 7 bar and 99.99% purity, plus a compressed-air supply at 6 bar. Check all utility connections in advance of installing the equipment.
| Specification | Published requirement | Planning note |
|---|---|---|
| Payoff reels | Ф236 × Ф25.4 × 108 mm; Ф267 × Ф25.4 × 180 mm; maximum full-reel weight ≤10 kg | Verify reel dimensions and weight |
| Take-up reel | T-type reel: Φ410 × Φ50.8 × 391 mm, alternatively a fiber-optic reel | Verify the preferred reel format |
| Electrical and environmental requirements | 380 V ±10%; 15 to 25°C; relative humidity ≤85% | Provide a clean, dry area without drafts |
| Gas utility supply | Nitrogen at 7 bar and 99.99% purity; compressed air at 6 bar | Verify gas supply capacity before installation |
Equipment For Fiber Payoff And Gathering
Optical fibers are guided toward the forming section by the payoff and gathering components. The associated controls help maintain a steady supply of fiber while reducing handling risks.
Sixteen-Spool Payoff With Tension Control
The active payoff accommodates 16 spools, incorporates traversing, and permits independent tension adjustment. The permitted weight for an individual spool is up to 10 kg. The technical details list 0.4 to 2 N tension with ±0.02 N accuracy, together with a 550 W motor. Because a separate overview states 40 to 150 g with ±2 g accuracy, ask the manufacturer to clarify the correct values for your intended setup.
Fiber Guidance, Break Detection, And Static Control
The forming area receives fibers through U-groove guides, multi-groove gathering rollers, and devices designed to prevent jumping. A break-detection system and alarms notify operators when problems occur. Protective guards and pneumatic clamping provide additional support for safe material handling. A rod-type electrostatic dust collector is positioned at the fiber exit, and additional anti-static devices help control dust throughout the gathering path.
| Equipment component | Specified details | Purpose |
|---|---|---|
| Payoff | Capacity for 16 spools, each weighing up to 10 kg | Supplies fibers using traversing |
| Motor and tension system | Tension of 0.4 to 2 N, accuracy ±0.02 N; motor rated 550 W | Supports regulated payoff of fibers |
| Guidance and safety | Grooved rollers, alarms, guards, and pneumatic clamping | Guides fiber movement and assists material handling |
| Static control | Rod-type dust collector and anti-static equipment | Helps reduce dust near fiber routes |
Precision Molding And Intermittent Adhesive Dispensing
Operators can adjust adhesive positioning and mold alignment through the forming platform. These settings allow the production process to be adapted to the intended ribbon configuration.
Ribbon Formation Using An Adjustable IBR Mold Platform
Ribbon formation uses three mold assemblies, each capable of holding up to five Nordson EFD jet valves. The mold adjustment range extends from 0 to 15 mm, while the mold base can be maintained between 20°C and 60°C. Precision valve groups mounted on sliding tables allow fine positioning and accurate application of adhesive dots.
Configurable Nozzle Arrangements For Twelve- And Sixteen-Fiber Ribbons
The 12-fiber configuration employs a 5+5+1 valve arrangement. Production of the 16-fiber format uses a 5+5+5 configuration. Operators can adjust adhesive-dot spacing and the number of dots through the interface to match the selected optical fiber ribbon design. A dedicated adhesive is required for the coating and curing stages.
| Process setting | Format With 12 Fibers | Format With 16 Fibers |
|---|---|---|
| Dispensing valve layout | 5+5+1 valve configuration | 5+5+5 valve configuration |
| Mold adjustment | 0 to 15 mm adjustment | Adjustment range of 0 to 15 mm |
| Temperature of the mold base | Temperature range of 20°C to 60°C | Temperature range of 20°C to 60°C |
UV-LED Curing For Bonded Fiber Ribbons
Adhesive across the fiber assembly is cured through a sequence of UV exposure stages. Prospective buyers can assess the oven configuration and listed operating specifications to determine whether the equipment suits their production process.
Pre-Curing And Main Curing Stages
Pre-curing is handled by three specialized 800 W LED-UV ovens. Fibers from each mold group pass through their respective pre-curing unit before entering the principal 6 kW post-curing oven. Adjustable shutters reduce potential UV leakage and nitrogen loss. Published specifications identify a dominant wavelength of 395 nm ±3 nm, a curing degree of at least 85%, and post-curing power of at least 2.5 kW.
Managing Nitrogen Supply And Curing Performance
The nitrogen flow rate and pressure can be adjusted by hand. The system additionally switches nitrogen on when starting and off when shutting down. At production speed under continuous stable conditions, the specified lamp-array power consumption is no more than 80% of total power. These specifications provide a reference for comparing equipment, although testing conditions should be verified with the supplier. Discuss how the operating settings may change depending on the adhesive and materials selected.
Visual Monitoring, Capstan, And Take-Up
As fibers travel through the equipment, visual monitoring and steady winding support the maintenance of material quality. The published operating settings also offer buyers useful criteria for comparing equipment against their cable production requirements.
Real-Time Inspection Of Fiber Colors And Adhesive Dot Placement
A microscope and camera provide enlarged images in real time. Operators can inspect optical-fiber color order and verify the presence of resin dots at individual dispensing locations. This inspection helps identify ribbon problems before the material enters the winding stage.
Precision Take-Up With Servo-Controlled Traction
The Φ190 mm capstan traction wheel is driven by a 1 kW AC servo motor. The listed measurement accuracy exceeds 1‰. The adjustable tension range is 50 to 500 g, with control accuracy of ±5 g. These operating parameters help maintain careful fiber-ribbon handling as the material advances through the line.
The specified take-up speed is 600 m/min, and the maximum spool weight is 30 kg. The servo-driven take-up and traversing assemblies support uniform positioning during winding. Cable pitch can be adjusted continuously between 1 and 6 mm. Position detection and direction changes are supported by a photoelectric sensor. Check the intended cable requirements and actual operating conditions with the manufacturer.
Electrical Controls And Production Monitoring
Clear control functions help production staff manage settings, monitor system conditions, and prepare smooth stopping procedures. According to the manufacturer, the machinery incorporates Siemens controls alongside Schneider Electric switchgear.
PLC And Touchscreen Operation
Siemens S7-1200 and S7-1500 PLCs manage the ribbon manufacturing system through a 10.4-inch Siemens touchscreen. Schneider Electric provides the low-voltage switching equipment. The system supports both interlocked operation across the full production line and separate operation of individual units.
Process Settings, Warning Alarms, And Preset-Length Shutdowns
Through the touchscreen, operators can manage process settings, activate curing ovens, configure wire feeding, and view alarms. It also displays lamp operating hours, live lamp current, oven temperature, and the equipment’s accumulated operating time. A meter-counter correction function helps synchronize displayed length measurements with actual material movement.
Operators can program a target production length that triggers deceleration or shutdown. The function supports managed stopping as a cable manufacturing run reaches its planned length. Verify the available controls and configuration requirements with the supplier before purchasing.
| Control-system feature | Listed detail | Use |
|---|---|---|
| PLC and display | Siemens S7-1200/S7-1500; 10.4-inch touchscreen | Configure settings and examine production data |
| Electrical control components | Low-voltage switchgear from Schneider Electric | Provides support for system control |
| Equipment monitoring and shutdown control | Operating data for lamps, ovens, runtime, and meters; preset-length function | Track operating conditions and initiate machine stopping or slowing |
Materials, Process Compatibility, And Ribbon Quality
Adhesive selection affects both the consistency of coating application and the final product. Rather than recommending a general adhesive, the supplier specifies a formulation dedicated to the equipment’s coating and curing operations.
Specialized Adhesive Used For Bonding And Curing
Separate valve switches on the pressurized adhesive supply let operators control individual feed paths. Precision pressure-regulating valves help maintain controlled adhesive delivery at each dispensing location. Air pressure can be regulated but must remain at or above the listed minimum of 0.5 MPa.
The adhesive lines are black to reduce the risk of UV-triggered reactions while the system operates and cures material. This protection is important because premature exposure may change adhesive properties before application to the fiber.
Before selecting materials for a secondary coating line, verify adhesive compatibility, production settings, and required surface-quality standards with the supplier. Discuss the material’s expected performance across your planned application and run duration. Clear process instructions can help maintain quality from initial setup through final production.
Installation Requirements And Included Documentation
Ensure the workspace and utility supplies are ready before scheduling the machine’s installation. The supplier’s specifications provide guidance for planning the production site and supporting consistent operation of the fiber-optic machinery.
Required Facility Conditions And Connections Provided By The Buyer
Install the machinery in a clean, dry, enclosed environment protected from drafts. Keep the operating area between 15 and 25°C, with humidity at or below 85%. Provide nitrogen at 7 bar and 99.99% purity, along with compressed air at 6 bar.
The equipment package does not include connecting cables or cable trays. The purchaser is responsible for supplying the main incoming power cable. Before installation, check cable routing and utility capacity, particularly when the machine will be located near secondary coating operations.
Documentation For Operation, Installation, And Maintenance
Documents covering installation, equipment use, and maintenance are provided by the manufacturer. Inspect the supplied documentation before commissioning so personnel can organize tasks and obtain required materials.
- Instruction manuals, operating guides, and a general layout drawing
- Electrical schematics, wiring diagrams, and drawings for installation and maintenance
- Manuals for purchased parts and a list of wear parts for maintenance planning
These documents help maintenance and production teams prepare for initial startup and regular equipment care.
Choosing A Ribbon Production Line For Your Manufacturing Needs
First determine which finished ribbon products your business plans to offer. The machinery supports 12F and 16F formats and has a stated construction speed of 600 m/min. Compare those specifications with your expected product mix, production targets, and anticipated cable demand.
Verify take-up reel compatibility before placing an equipment order. The standard IBR reel has dimensions of Φ410 × Φ50.8 × 390 × Φ310 mm, supports up to 30 kg, and provides cable pitch adjustment from 1 to 6 mm. Check that these specifications suit your production facility and material-handling operations.
Payoff reel compatibility also deserves attention. Available options include international-standard spools accommodating 25.2 km, 50.4 km, and 63 km. Obtain the exact spool dimensions before ordering materials or planning the length of manufacturing runs.
Evaluate utilities, adhesive requirements, and operator-monitoring capabilities alongside production speed. Assess whether the equipment arrangement is appropriate for fiber cable, loose tube, or the specific application in your cable production process. Discuss machine configuration and commissioning arrangements with Shanghai Weiye before committing to the purchase. A thorough compatibility assessment can help prevent expensive modifications later.
| Production planning consideration | Manufacturer-listed specification | Buyer check |
|---|---|---|
| Ribbon configurations and operating speed | 12F and 16F formats; 600 m/min | Compare with target production and product mix |
| Take-up | 30 kg maximum capacity; adjustable pitch from 1 to 6 mm | Verify that the reel and site arrangements are suitable |
| Fiber payoff reel options | Capacities of 25.2 km, 50.4 km, and 63 km | Verify exact spool dimensions |
Request A Quote For The Intermittent Bonded Ribbon Production Line
For U.S. manufacturers, the equipment provides 12F and 16F configurations, a listed construction speed of 600 m/min, and dedicated machinery for forming optical fiber ribbons. Use these specifications to determine whether the machine is appropriate for your intended cable application.
A pricing inquiry should include your chosen format, projected production quantity, reel requirements, and facility utility details. Also describe the fiber type and handling requirements so Shanghai Weiye can evaluate the proposed configuration.
Before ordering, verify adhesive compatibility, the specified LED wavelength of 395 nm ±3 nm, and the published curing performance. Discuss how the stated specifications affect your intended material and finished surface-quality objectives.
Consult the product page for the published equipment description. Verify the final configuration, shipment details, and installation commissioning with Shanghai Weiye Optic Fiber Communication Equipment Co., Ltd. The supplier provides its address as 201 Minyi Road, Songjiang District, Shanghai. You can call 021-60701630 to review your project needs with the supplier. A detailed quotation inquiry helps define the next steps in purchasing.